Our Price
2022 Volkswagen® Tiguan
2.0T SEL R-Line 4MOTION
•
60,807
miles- Please Call for Price
Check Availability
Description
Jeff Wyler Eastgate Auto Mall is excited to showcase this outstanding 2022 Volkswagen Tiguan 2.0T SEL R-Line. As a stylish and reliable SUV, the Tiguan offers a dynamic blend of versatility and performance that is perfect for modern driving needs.
This Tiguan is powered by a robust Intercooled Turbo Regular Unleaded I-4 2.0 L/121 engine, paired with an efficient Automatic transmission, driving an All-Wheel Drive (AWD) system. This powertrain delivers capable performance while ensuring respectable fuel efficiency of 21 mpg in the city and 28 mpg on the highway, making it great for both city commutes and longer trips.
The exterior of this Tiguan is elegantly designed with body-color bumpers and heated door mirrors, further enhanced by the sporty spoiler and sleek roof rack featuring rails. It rides confidently on stunning 20" Machined Black Alloy wheels that add to its bold presence on the road.
Inside, you'll find a meticulously crafted interior featuring Perforated Vienna Leather Seating Surfaces, with heated and ventilated front comfort sport seats that assure a cozy driving experience no matter the season. The cabin is also equipped with advanced convenience features such as an auto-dimming rear-view mirror, a power moonroof, and a memory seat function for added comfort.
Technology-wise, the Tiguan does not disappoint. It includes an advanced Navigation system with VW Car-Net Guide & Inform to help you navigate with ease. The infotainment system is powered by MIB3 Discover Media AM/FM/HD Radio, accompanied by 8 speakers for a premium audio experience. For seamless connectivity, there's a Radio data system and an AM/FM radio with SiriusXM capabilities.
Safety is a priority, with a suite of features including electronic stability control, dual front and side impact airbags, and a security system with a panic alarm. The Tiguan also features a useful rear-view camera to assist with parking and reversing maneuvers.
Additional highlights include:
- 4-Wheel Independent Suspension for a smooth ride
- Auto High-beam Headlights and Rain sensing wipers for optimal visibility
- Remote keyless entry and a Power Liftgate for convenience
- A Sport steering wheel and Leather shift knob for a touch of elegance
This vehicle has seen a healthy life with an odometer reading of 60,807 miles. Clean CARFAX documentation assures transparency and peace of mind. As a special mention, eligible vehicles may qualify for the Wyler Assurance Program, offering a 6-month/6,000-mile limited warranty, subject to certain conditions and inspection results.
Explore the exciting features of this 2022 Volkswagen Tiguan 2.0T SEL R-Line. Reach out to our team for further details or to arrange a test drive. Experience the reliability and comfort of Volkswagen, proudly available at Jeff Wyler Eastgate Auto Mall.
Basic information
Stock #
VIN
Let's get started
— or —
Schedule a test drive
Schedule a time to test drive this vehicle at our dealership.
Dealership Information
Sunday
Closed
Monday
9:00am - 8:00pm
Tuesday
9:00am - 8:00pm
Wednesday
9:00am - 8:00pm
Thursday
9:00am - 8:00pm
Friday
9:00am - 8:00pm
Saturday
9:00am - 7:00pm
Disclaimer
Vehicle pricing includes all applicable manufacturer offers (subject to expiration dates) and a documentary service fee*. Tax, title, tags, and government fees are excluded and must be paid by the purchaser. Additional offers (e.g., military, loyalty, college grad) may apply but are not reflected in advertised pricing. Actual dealer pricing may vary from MSRP. Due to limited inventory and third-party data compilation, all prices and offers are subject to change without notice. Vehicles are subject to prior sale and may be in transit; please contact the dealer to confirm availability. Images may be stock photos and might not reflect exact vehicle specifications. Financing is subject to lender approval based on approved credit and may not be compatible with special factory financing. EPA mileage estimates are for comparison only; actual mileage varies. Vehicles may be subject to unrepaired open recalls; visit safercar.gov for current status. Jeff Wyler reserves the right to correct errors/omissions and makes no representations, express or implied, regarding vehicle condition, history, or warranties. Purchaser must confirm all data prior to purchase. Alternate website pricing may not be accepted. All pricing includes a documentary service fee of $398 in OH, $260 in IN, $589 in Jefferson Co., KY, and $498 in Campbell/Kenton Co., KY. This fee does not include preparation of legal documents or documents incidental to credit extension. Credit card payments are subject to a 3% merchant services convenience fee. Wyler® and Jeff Wyler® are registered trademarks of the Jeff Wyler Automotive Family, Inc.
2022 Volkswagen® Tiguan
2.0T SEL R-Line 4MOTION
•
60,807
miles- Please Call for Price
